Monash Freeway

Wednesday 31 October, 2007

The Monash section comprises of the Monash Freeway between the eastern end of CityLink at Glenferrie Road and South Gippsland Freeway. It is being delivered in three sections:  

  • The Glenferrie Road to Warrigal Road section is being delivered under an alliance contract between AbiGroup and SKM.
  • The Warrigal Road to Jacksons Road section is being delivered by Negri Contractors.
  • The Jacksons Road to South Gippsland Freeway section is being delivered by Fulton Hogan.

The specific works that form the Monash section of the project include: 

  • an additional lane in each direction between Hawthorn and Dandenong;
  • Glenferrie Road to Warrigal Road will be widened on the outside of the current lanes;
  • Warrigal Road to South Gippsland Freeway will be widened on the inside of the current lanes;
  • widening of the bridges at Gardiners Creek, Ferntree Gully Road, Jacksons Road, Police Road, Gladstone Road and Dandenong Creek;
  • widening of the Great Valley Road; and
  • reconstruction of the ramps at High Street.

In addition, the project will include the introduction of an intelligent freeway management system to improve traffic flow and travel time reliability during peak times.

Construction commenced on the Monash Freeway in October 2007.

Further information on the Monash Freeway section of this project is available via the links below, or by referring to the frequently asked questions.

East Malvern and York Road bridges provide better links

The installation of two new pedestrian bridges at East Malvern and Glen Iris and improvements to the Gardiners Creek Bike Trail undertaken as part of the M1 Upgrade are playing a major role in improving recreation and transport options.

Highlighted Roadworks

Current Works on Fourth Lane Inbound

12 July 2010

CityLink is carrying out strengthening work on the elevated inbound section of the road, to cater for the projected future growth in the number and size of freight vehicles. For further details, read on.

Temporary changed traffic conditions on Hyde Street - August 6 - 14

A shuttle flow/contra flow arrangement will be in place on Hyde Street between 6.30am - 2.30pm, August 6 - 14 2010